Côte d’Ivoire clean energy hydro plant is first by an independent power producer
In July 2021, EAIF announced a loan of €25 million over 18 years to Ivoire Hydro Energy (IHE) which will build a 44MW hydro electricity generation plant on the Bandama River near the village of Singrobo in Côte d’Ivoire. The €174 million project is forecast to take some 36 months to build and is forecast to start producing power in early 2023. It is the country’s first hydroelectric development by an independent power producer. The project has seen EAIF and PIDG deliver on three core objectives; mobilising private capital, enabling economic development and contributing to increasing Africa’s stock of renewable energy infrastructure.
A long-term power purchase agreement will see all of the energy produced by the Singrobo plant sold to Compagnie Ivoirienne d’Electricité, the operator of Côte d’Ivoire’s national grid. The new plant will be an important strategic economic asset for Côte d’Ivoire. In addition to adding to the country’s generation capacity, the plant enhances the system’s flexibility, meaning it may be called in to meet baseload demand as well as peak demand.
Electrification rates in Côte d’Ivoire range from c88% in urban areas to as low as 31% in rural parts of the country. Côte d’Ivoire’s economy has been growing and diversifying since the return of political stability in 2011. It has the largest and most diversified economy in the West African Economic and Monetary Union, representing c30% of the monetary union’s total GDP.